Facility Manager's Report - removed
- Web Administrator
- Nov 3, 2016
- 2 min read
• Firm Finish have fitted a new glass panel balustrade for the entrance area for building 6. • The lock on Front Door unit 216 needed replacement parts and refitting. • Obtaining quotes to repair two leaking garden taps and cracked down pipe • An adjustment of modem settings has the internet now working in one unit • Removal of small berry tree growing in roof gutter of Building 4 • One of the three long term faulty street lights is now working, the electrician is still working on the remaining two that have underground wiring issues • Garage Door for Building 2 and 3, ceased working on Sunday night, I locked it open until the serviceman arrived • Garage door for Building 6, had a recoil spring snap overnight, this was rectified in the morning • A Sump pump in building seven failed, the secondary one is operating, and the faulty one is being repaired this week • New fire evacuation diagrams have been printed and are being affixed to the lobby walls • The basement carparks will be hosed out over the upcoming weeks • Two electronic locks were faulty, and have been replaced on Lobby doors in Building 1 & 3 • Assistance with padding lifts for three new residents moving in • The replacement of Emergency Lights with battery continue over the next two weeks ? Circular round fluoro lights in each lobby & fire escapes, ? Exit Signs (Green) above each fire door ? Double long fluoro lights in the basements • The 4th camera is now fitted and operational at the front gate • The security camera monitoring system has been relocated to a secure location • The video link to building 1 intercoms is now operational • The right-hand door frame, Building 1, eastern lobby entrance is loose and not fixed securely - assessing repair • The Swimming Pool is 21degres average , tiles have been pressure hosed. • The book exchange library is becoming established in the Gym
Comments