top of page
Search

Maintenance - replaced

  • Writer: Web Administrator
    Web Administrator
  • Jun 27, 2016
  • 1 min read

Article updated: 16/5/16

Other recent maintenance projects:

•All smoke alarm batteries have been renewed

•Emergency fluoro light fittings are being replaced with more energy efficient LED fittings as they fail.

•New sump pumps have been installed bldg 1

•New pool chlorinator has been installed

•New garage door motor installed bldg 4

•Garage door bldg 5 is being repaired

•Incoming mains water pressure reducing values have been serviced improving the water flow rate.

•Water feature leak - has been repaired

•Garden wiring - repaired and is now safe

•Rooftop repairs/resealing (bldgs 1-4) - completed


 
 
 

Recent Posts

See All
Esperance Development

​Article inserted: 27/7/20 ​ For those who are interested in the development next door in the old Village Square property, the link to...

 
 
 
Gym Noise Notice - removed 12/3/22

Article inserted: 12/11/16 For the peace and comfort of others using the Gym, please refrain from playing music using Bluetooth Speakers...

 
 
 
Book Exchange - Library - Removed

Article inserted: 3/10/16 A new initiative by George is to create a library in the old office area.  The gym key now opens the library....

 
 
 

Comments


© 2024 by W-Biz. 

bottom of page